Solar Park South - International Online -  project 164 of 201  
archi page 2 (page 1)
olga bashnina tim kosharny (russian federation)
Viaducts and tunnels are under repair for its possible safe operation. Facades of new constructions are glassed-in (southward glassed part is a source of a renewed solar energy, northward part of facades - a ventilated facade and at the same time vertically located multi-colored lawn. The elevators PANORAMIC ones with transparent well and cabin.
Viaducts are strengthening for further safe operation. The finishing of strengthened legs and route ends of viaducts with plaster on steel net is carrying out.
As far as new automobile route consists basically of tunnels and going by route do not giving the possibility to observe the place, park road gives the possibility on low speed of electromobiles to observe scenic area of Calabria coast.
Cost of entire range of works on repairing of 10 km of old route with tunnels and viaducts, building of new constructions, tapping points with new route in view to commercial use of project and its pay-back.